|

HHI’s Engine & Machinery Division successfully completed a function test
for a side thruster with a capacity of 2,000kW on February 12.
The side thruster will be installed in a 145,000㎥ LNG carrier for Korea
Line Corporation currently being constructed at Daewoo Shipbuilding &
Marine Engineering.
Successful performance in the test was significant since it was the first
side thruster built by HHI. The test was performed under the attendance of
the ship owner and classification association.
The Engine & Machinery Division accomplished the development of a side
thruster using its own technology in 2005. After production of a
prototype, it successfully passed various test such as propeller pitch
capability and rotation. Currently, HHI has a backlog for about 30 side
thrusters.
|